![]() ![]() A separate sprinkler control valve (option reference 3-1.1 exception No. Water Supply: The only acceptable riser arrangement is Figure A-2-2 (c).Any deviation from approved plans shall be noted on job plans by installers and approved by AHJ. No work shall be done until all permits and approved plans have been obtained. An approved set of plans and permits shall be on job site at all times. This shall be done as early as possible to facilitate information for hydraulic calculations and to have the new meter(s) installed. It is the responsibility of the owner and/or builder to contact the Community Development Department. It shall be the responsibility of the fire sprinkler contractor to inform all parties of the requirements of the fire sprinkler system. ![]() The installation of an NFPA 13D fire sprinkler system involves not only the fire sprinkler contractor, but also the plumbing and electrical contractor as well.Apply for a Fire Permit Online using Citizen Self Service ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |